The Technology research on mining Face Support after the final coal mining of the high-gas and large mining face
Wang cun quan
( Yungang mine , Datong Coal Mine Group , Datong , Shanxi Province 037017 , China)
Abstract This article present the Manner of mining Face Support after the final coal mining,which is the high-gas and large mining face . After the Practical application of this manner ,we Achieved a very highly speed of Change mining face, and did a Comparative Analysis of Relevant Effect...After all these works, a key Point of the Supporting technique Design and Application has been proposed, which is very useful for large mining face.
Key words high-gas large mining face Support after the final coal mining mining face Changing
1 礦井概況
云崗礦位于山西省大同市西郊云崗溝內(nèi),距大同市區(qū)18km,開采大同侏羅紀(jì)煤層,井田南北長(zhǎng)13.1km,東西寬5.75km,面積59.0003 km2。礦井開拓方式為立井、斜井混合式開拓,主運(yùn)輸水平為+980m水平,+1030m水平為輔助運(yùn)輸水平。礦井通風(fēng)方式為分區(qū)抽出式。目前井田南部12#層410盤區(qū)是該礦主要生產(chǎn)盤區(qū)。
1.1 工作面概況
該礦410盤區(qū)大采高綜采隊(duì)已采出三個(gè)工作面,見表1:
表1 工作面基本情況表
工作面編號(hào) |
走向長(zhǎng)/ 傾斜長(zhǎng)(m) |
煤層厚度/ 平均厚度(m) |
煤層傾角/ 平均傾角(o) |
開采方式 |
8611 |
752/139.5 |
6.2~7.5/7.1 |
2~4/3 |
見底板留頂煤開采 |
81001 |
664/178 |
4.5~5.3/4.9 |
3~5/4 |
|
81003 |
1244.9/181.5 |
2.9~5.1/4.05 |
2~6/4 |
三個(gè)工作面的頂?shù)装鍘r性為:偽頂為碳質(zhì)泥巖,局部層理節(jié)理較發(fā)育,厚度0.2~0.9m;直接頂為灰白色中砂巖~粉細(xì)砂巖互層,厚21.44~14.6m,含二硫化鐵結(jié)核,致密,堅(jiān)實(shí),水平層理發(fā)育,普氏硬度系數(shù)f=7以上;直接底為灰白色細(xì)砂巖~粉細(xì)砂巖互層,層理發(fā)育,厚度5.96~3.31m。
三個(gè)工作面的地質(zhì)條件為:煤層為一單斜構(gòu)造,北高南低,局部有一層夾石,厚度0.85m~0.5m,平均0.6m。8611面無斷層及其他構(gòu)造,81001、81003面有斷層7條,落差從0.6m—1.7m,沖刷一處,沖刷處煤層最薄處為3.0m。層間距為:距9#層約為39m,距7#層約為73m,距3#層約為112m,
1.2 三個(gè)工作面設(shè)備配備均為:MG800/2000-GWD型雙滾筒采煤機(jī)一部,ZZ9900/29.5/50型支撐掩護(hù)式支架百余架,SGZ-1000/1050型刮板輸送機(jī)一部,SZZ-1000/375型轉(zhuǎn)載機(jī)一部,PCM-250型錘式破碎機(jī)一臺(tái),BRW500/31.5型乳化液泵兩臺(tái),SSJ-1200/250×2型可伸縮皮帶機(jī)一部。
1.3 ZZ9900/29.5/50型支撐掩護(hù)式支架技術(shù)特征:
支架初撐力:7734kN(P=31.4Mpa)支架工作阻力:9900kN(P=40.2MPa)
支架支撐高度:2.95~5.0m 支架中心距:1.75m 支架重量:31.5t
1.4 采煤工藝:采用傾斜長(zhǎng)壁后退式綜合機(jī)械化采煤工藝,采煤機(jī)落煤、裝煤,采用刮板運(yùn)輸機(jī)運(yùn)煤,液壓支架支護(hù)工作面頂板,采用自然垮落法結(jié)合人工強(qiáng)制放頂管理采空區(qū)頂板,采高4.8 m,煤層厚度大于4.8m時(shí),見底板留頂煤開采,煤層厚度小于3.0mm時(shí),根據(jù)工作面實(shí)際情況割底或割頂開采,循環(huán)進(jìn)度0.865m。
2 停采支護(hù)設(shè)計(jì)的關(guān)鍵參數(shù)
因大采高工作面采場(chǎng)空間大,斷面大、采空區(qū)懸板和機(jī)道頂板容易塌落,工作面煤壁容易產(chǎn)生深度片幫,在停采和撤架期間易發(fā)生冒頂事故,
根據(jù)大采高工作面實(shí)際情況,在進(jìn)行停采支護(hù)設(shè)計(jì)時(shí),要充分考慮工作面的特點(diǎn)及撤退設(shè)備的需要,確定以下重要參數(shù):
(1)明確合理的停采線位置,并對(duì)停采線附近頂板巖性、上覆狀況等情況進(jìn)行鉆孔分析,以避免或減少頂板周期來壓、上覆應(yīng)力區(qū)等對(duì)收尾的影響;
(2)確定合理的采高、留頂煤或留底煤收尾及撤架機(jī)道寬度;
(3)確定鋪設(shè)金屬網(wǎng)長(zhǎng)度和位置、金屬網(wǎng)層數(shù)、規(guī)格;
(4)根據(jù)頂板巖性,確定錨索和錨桿支護(hù)的間排距、錨索長(zhǎng)度;
(5)確定工作面煤壁護(hù)幫措施;
(6)考慮頂板難以支護(hù)及發(fā)生變化時(shí)的補(bǔ)強(qiáng)支護(hù)措施。
3 停采支護(hù)方式的選擇
3.1停采期間采高和割煤工藝的確定
停采期間要選擇合理的采高,主要出于以下幾點(diǎn)考慮(1)降低采高可縮小采場(chǎng)空間,有利于停采支護(hù)對(duì)頂板的有效維護(hù);(2)合理的采高是停采后撤架通道的高度和支架轉(zhuǎn)向方便的需要;(3)采高要留有余量,以為防止因停采后和撤架期間工作面頂板壓力逐漸增大、頂板下沉量也逐步加大,造成撤架通道高度降低和壓架事故發(fā)生。
由于工作面使用ZZ9900型液壓支架,支架支撐高度為2.95~5.0m,支架主頂梁平面至側(cè)護(hù)板下端的高度為0.6m。因此,工作面停采期間的采高=2.95m+0.6m+備用高度,根據(jù)生產(chǎn)過程中頂板來壓及支架收縮情況,備用高度取0.65m,采高確定為4.2m。
由于工作面停采期間煤層厚度最低在5.1m以上,且采高確定為4.2m,故需要選擇留頂煤還是留底煤割煤??紤]到停采過程中,直接頂不平整,頂煤在0.9~2.5m之間,頂煤能夠完整留住且采煤機(jī)可以割平頂板,保證頂煤平整,有利于支架接頂。同時(shí),如果留底煤開采,則撤設(shè)備及支架時(shí),由于底煤松軟會(huì)被拉不出溝槽,給設(shè)備的行走帶來困難,但留頂煤見底板停采,由于底板堅(jiān)硬有利于設(shè)備快速撤走。因此,停采期間選擇留頂煤見底板的割煤工藝。
3.2 撤架機(jī)道寬度的確定
根據(jù)工作面支架撤出時(shí)所需轉(zhuǎn)向?qū)拵У睦碚撚?jì)算和現(xiàn)場(chǎng)實(shí)測(cè),支架降到4.0m時(shí)所撤支架要求機(jī)道寬度為4.3m,考慮到外部原因和其它余量,確定撤架機(jī)道寬度為4.6m。
3.3 工作面停采支護(hù)方法的確定
工作面停采過程中頂板采取網(wǎng)+繩+梁+錨索方式支護(hù):
(1)金屬網(wǎng)為1.95×5m菱形網(wǎng)(根據(jù)本支架定制),鋪網(wǎng)長(zhǎng)度17m(前1.5m落地段為單層,后面垂直段和鋪頂段為雙層),見圖1;
(2)從距液壓支架頂梁端0.5m開始每隔0.8m布置一根傾向鋼絲繩,通過錨索將鋼絲繩兩端分別固定在工作面頭尾端頭,鋼絲繩要拉緊繃直,中間每隔0.2m用聯(lián)網(wǎng)絲與頂網(wǎng)固定,見圖1;
(3)液壓支架頂梁上布置三排傾向梁,梁長(zhǎng)4.5m;每個(gè)支架中心線對(duì)正機(jī)道位置布置一根走向梁(錨索梁),梁長(zhǎng)4.8m,鋼梁兩端打眼用錨索固定,見圖2;
(4)液壓支架頂梁及機(jī)道上方布置7排錨索,錨索φ15.24mm、長(zhǎng)6.0m;其中機(jī)道上方可布置為三排錨索或補(bǔ)強(qiáng)為三排錨索與兩排錨桿聯(lián)合支護(hù),見圖2。
圖1 工作面停采支護(hù)鋪設(shè)金屬網(wǎng)及鋼絲繩意圖
圖2 工作面停采支護(hù)示意圖
工作面煤壁護(hù)幫支護(hù)方式為:金屬網(wǎng)+四排錨索錨桿,從上往下分別為錨索、錨桿、錨索、錨桿,距頂板距離分別為0.5m、1.0m、2.0m、3.3m,錨索長(zhǎng)4.0m,螺紋鋼錨桿長(zhǎng)1.7m,其中最上面一排錨索要有仰角,錨固在頂板上。現(xiàn)場(chǎng)需要時(shí),最上面的一排可補(bǔ)強(qiáng)為1m的短錨索梁。
3.4 停采期間一通三防主要措施
工作面采用一進(jìn)一回的“U”形通風(fēng),工作面配風(fēng)量為1800m3/min。由于工作面瓦斯最大涌出量15m3/min,當(dāng)工作面開采至150m后,上隅角瓦斯涌出量明顯增大。采取的措施有:在工作面尾部安裝了2道可伸縮式風(fēng)帳;在回風(fēng)運(yùn)料巷安裝JBT-52型(功率2×11kW)抽出式風(fēng)機(jī),用來排放工作面上隅角瓦斯;另外要保證瓦斯檢測(cè)、監(jiān)控設(shè)備的正常使用及維護(hù)。
根據(jù)工作面的開采工藝和防火經(jīng)濟(jì)指數(shù),并參考該礦綜放面的防火經(jīng)驗(yàn)。決定采用噴灑阻化劑的工藝防止采空區(qū)遺煤自燃。噴灑方法是分別在上下順槽巷道建立移動(dòng)式阻化泵站,選用阻化效果好的工業(yè)氯化鈣(CaCL2·5H2O)作為阻化劑,向采空區(qū)噴灑阻化溶液,阻化溶液濃度必須達(dá)到15~20%。在生產(chǎn)過程中,重點(diǎn)為“三線一帶”的噴灑,一周兩次。距停采線40m范圍內(nèi),除在上、下隅角各20m噴灑外,還在工作面中部進(jìn)行加強(qiáng)噴灑。
3.5 設(shè)備回收方法
在工作面頭中尾部分別安裝45kW雙速絞車,鋼絲繩為1.2寸,在工作面回風(fēng)運(yùn)料巷(設(shè)備撤出使用的順槽)超前位置打一設(shè)備吊裝硐室用于設(shè)備裝車。撤架過程采用機(jī)道布置兩個(gè)掩護(hù)支架進(jìn)行撤架,每撤一個(gè)支架,掩護(hù)架邁步前移一次,使用叢柱支護(hù)撤架三角區(qū)空間.
4 應(yīng)用效果分析
通過該礦三個(gè)大采高工作面的停采搬家實(shí)踐,應(yīng)用多種支護(hù)技術(shù)的變化與組合,尤其是鋪設(shè)鋼絲繩與錨索網(wǎng)聯(lián)合支護(hù),對(duì)于撤架三角區(qū)與機(jī)道頂板的支護(hù)起到了較好效果。
雙層金屬網(wǎng)與傾向鋼絲繩對(duì)破碎頂板的包裹效果好,不宜發(fā)生扯網(wǎng)現(xiàn)象。
傾向梁、錨索配合有效支護(hù)了支架上方頂板,并有利于撤架三角區(qū)的形成和加強(qiáng)臨時(shí)支護(hù),保證了撤架安全。
錨索與走向梁的配合使主動(dòng)與被動(dòng)支護(hù)融為一體,有效的將頂板加固為穩(wěn)定的整體結(jié)構(gòu)。
工作面煤壁通過錨網(wǎng)護(hù)幫,解決了煤壁片幫和防止頂板邊角發(fā)生大的離層。
由于工作面采高在4.2m,停采支護(hù)期間架梁、上鋼絲繩、上托板、掛網(wǎng)挑網(wǎng)等均需登高作業(yè),要使用專業(yè)凳子并在機(jī)道支設(shè)木支柱作為臨時(shí)支護(hù)。
為防止工作面煤壁片幫擴(kuò)大,護(hù)幫時(shí)采取先割頂?shù)恫⒅ёo(hù)上半部煤壁,再割底刀并支護(hù)下半部煤壁,從而實(shí)現(xiàn)了有效護(hù)幫與操作安全。
5 結(jié)論
高瓦斯厚煤層大采高綜采面停采支護(hù)技術(shù),由于對(duì)頂板尤其是撤架通道上方頂板的強(qiáng)力支護(hù),在投入上比一般綜采工作面要大,但杜絕了回撤設(shè)備與支架期間的頂板下沉及破碎冒落、扯金屬網(wǎng)、壓架等事故,避免了后續(xù)頂板支護(hù)材料和工時(shí)投入。該方案在技術(shù)上可行,安全上可靠,使搬家總時(shí)間大幅縮短為12天,提前10天進(jìn)入新工作面生產(chǎn),對(duì)在同類情況下的停采支護(hù)方面積累了寶貴的經(jīng)驗(yàn),有較大推廣價(jià)值。
參考文獻(xiàn):
[1]朱慶文.大采高綜采工作面成套技術(shù)[J].煤炭技術(shù),2004 (11).
[2]楊緒忠,李波,劉思佳.綜采工作面拆除時(shí)的頂板管理[J].煤礦開采,2002 (4).
[3]田文良,朱加強(qiáng).錨網(wǎng)支護(hù)技術(shù)在綜采工作面收作中的應(yīng)用[J].煤礦現(xiàn)代化,2006 (5).
[4]秦其智.大采高工作面停采頂板支護(hù)新方法[J].科技信息,2009 (23).
[5]邵玉峰.利用錨網(wǎng)錨索聯(lián)合支護(hù)來實(shí)現(xiàn)綜采工作面的快速回撤[J].黑龍江科技信息,2009 (17).
作者簡(jiǎn)介:王存權(quán)(1966-),男,山西大同人,碩士研究生,高級(jí)工程師,現(xiàn)任大同煤礦集團(tuán)公司云崗礦礦長(zhǎng),長(zhǎng)期從事煤礦生產(chǎn)管理工作。